Kth largest of n values, k much smaller than n. With heapq, which is O(n log k)?
Show answer

Answer

Keep a min heap of size k, pop when size exceeds k, answer is heap[0]
A size k min heap keeps the k largest and its root is the kth largest. Pushing all n values one by one is O(n log n) before any pop. A size k max heap evicts the wrong items. Sorting is O(n log n).

Source: Python heapq documentation

You already hold n task priorities in a list and need a heap before processing. What does heapq.heapify(tasks) cost, compared with pushing them one by one?
Show answer

Answer

O(n)
Bottom up heapify is linear because most nodes are near the leaves and sift down a short distance. O(n log n) is pushing n items one by one. O(log n) is one push. O(n2) is insertion into a sorted list.

Source: Python heapq documentation

heapq.heappush(h, (dist, node)) where node is a custom object without ordering. When does it raise TypeError?
Show answer

Answer

When two entries have equal dist, Python compares the node objects
Tuples compare element by element, so equal priorities fall through to the payload. Add a counter as a tie breaker: (dist, count, node). Tuples are pushable. heapq has no key argument and compares whole items. Float or int makes no difference.

Source: Python heapq documentation

On Python 3.13, heapq offers only min heap functions publicly. How do you get max heap behaviour for integers?
Show answer

Answer

Push -x and negate when popping
Negation turns the min heap into a max heap. Private helpers are not a supported API and re-heapifying each push is O(n). Python 3.14 added public max heap functions, which is why the version is stated. h[-1] is not the max of a heap. Sorting once breaks on later pushes.

Source: Python heapq documentation

heapq.nlargest(k, iterable) on n items. What is the complexity a candidate should quote?
Show answer

Answer

O(n log k)
nlargest keeps a heap of size k, so each of n items costs O(log k). O(n log n) is sorting. O(k log n) is heapify then k pops, which also needs O(n) to build. O(n k) is a linear scan per pick.

Source: Python heapq documentation

K Closest Points to Origin, n up to 104. Which is correct and avoids sqrt?
Show answer

Answer

Compare x*x + y*y, keeping a size k max heap via negated distances
Squared distance preserves order, and a size k max heap evicts the farthest. A size k min heap evicts the closest, which is backwards, and sqrt is unnecessary. Manhattan distance ranks differently from Euclidean. Sorting by coordinates is unrelated to distance.

Source: LeetCode 973. K Closest Points to Origin

Merge k sorted lists with N total nodes using a heap of list heads. Time?
Show answer

Answer

O(N log k)
The heap holds at most k items and each of N nodes is pushed and popped once. O(N log N) is collecting then sorting. O(N k) is scanning all heads each step. O(k log N) undercounts.

Source: LeetCode 23. Merge k Sorted Lists

Find Median from Data Stream with two heaps. Invariant?
Show answer

Answer

Max heap of the lower half, min heap of the upper half, sizes differ by at most 1
The tops of the two halves give the median in O(1) and inserts are O(log n). Two min heaps cannot expose the lower half's max. A max heap of the upper half exposes the wrong end. insort is O(n) per insert due to shifting.

Source: LeetCode 295. Find Median from Data Stream

Task Scheduler: each interval runs one task or idles, and the same task needs n intervals between runs. Tasks A x3, B x3, n = 2. Minimum intervals?
Show answer

Answer

8
(max_count - 1) * (n + 1) + count_of_max = 2 * 3 + 2 = 8: A B idle A B idle A B. 6 ignores cooldown. 7 counts only one task at the end. 9 adds an extra idle.

Source: LeetCode 621. Task Scheduler

IPO: you start with capital w. Project i needs capital[i] to start and adds profits[i]. Pick at most k projects to maximize final capital. Which structure combination?
Show answer

Answer

Projects sorted by capital needed, plus a max heap of profits for affordable ones
Unlock affordable projects as capital grows and always take the best profit. A profit only heap includes unaffordable projects. Sorting by profit once ignores that capital grows. DP over capital up to 109 is infeasible.

Source: LeetCode 502. IPO